Duration
This entrance is: | Permanent |
Entrance
Entrance Type: | Field Access | |
When is the entrance needed by: |
|
Location
Direction from road: | N |
County Road No.: | 51 |
specific road, landmark, or intersection: | 170th ave s, 150th st s |
Direction from specific road, landmark, or intersection: | N |
Miles: | 0.001 |
Mapped Location: | |
City: | Barnesville |
Present number of driveways: | 2 driveways in my yard, none for field access |
Distance from nearest driveway (enter 0 if N/A): | 7220 feet 0 inches |
Applicant
Applicant: |
|
Property Owner
Property Owner: |
|
Contractor
Contractor: |
|
Sketch
Sketch: |
|
Terms
I, We, the undersigned, herewith make application for permission to construct the Access Connection at the above location, said Access Connection will be constructed to conform with the regulations of the Department of Highway and to any special provisions included in the permit. It is agreed that all work will be done to the satisfaction fo the Department of Highway. It is further agreed that no work in connection with this application will be started until the application is approved and the permit issued. It is understood that this permit is conditioned upon replacement or restoration of the highway to its original or to a satisfactory condition. It is further understood that this permit is issued subject to the approval of local city authorities having joint supervision over said street or highway.
At minimum, applicants shall attach a sketch of the property which shall include identification of existing and proposed Access Connections in relation to any County Highways; and such sketches shall be drawn to scale when required by the Engineer. See Section 8.3.6 of the County Development Code for specific Access Permit submittal requirements.
The applicant should install a lath or stake at the location desired for the center of the proposed opening for accuracy during inspection prior to approval. The highway department will discuss the location with the applicant if it needs to be moved.
The Highway Department will inspect the location for safety, sight distance, proximity to other access openings and drainage requirements. The applicant will be notified of approval and/or any necessary requirements. All Access Connections will be reviewed for compliance with the County's Access Management Policy (see County Development Code Section 8.3.6).
If the Access Connection requires a drainage structure, the County will provide one culvert per quarter section in rural areas. In urban areas the County will provide one culvert per residence. The applicant will be responsible for installing the culvert the County has provided. The Highway Department will determine and order the appropriate size and length of culvert required.
If the Access Connection is for a residence or business receiving mail at the permitted location, Clay County will provide an approved mailbox support at the applicant's expense. Upon request, the mailbox support will be delivered at the same time as the culvert. The applicant will be required to install the support.
The cost of constructing the Access Connection is the responsibility of the applicant. This includes any fill or excavating that may be required. In urban areas, it is the responsibility of the applicant to remove and replace curb and gutter at the Access Connection location.
When construction of the Access Connection is completed in accordance with specifications and special provisions noted on the permit, the applicant shall notify the Highway Department for final inspection. The permitted Access Connection will not be considered complete until all disturbed areas have been fine graded, top soiled and seeded. All work is to be completed within 90 calendar days after receipt of the approved permit or as otherwise specified in the Access Permit. For additional information on permit duration standards, see Section 8.3.6 within the County Development Code.
Prior to beginning any excavation work, Minnesota Law requires the applicant or their contractor to contact Gopher State One-Call for locations of underground utilities. They can be reached at 800-252-1166.
Whenever work on the traveled portion of the roadway or shoulder is necessary, proper traffic control devices shall be furnished by the applicant and shall be in accordance with the most current edition of the Minnesota Manual on Uniform Traffic Control Devices, which is also available for review at the Clay County Highway Department at the applicant's request.
Please note that all equipment which may damage surfaced roadways is prohibited from use on the roadway. Any damage to the roadway surface due to loading, unloading or operating such equipment will be assessed to the applicant. Please help us protect our highway surfaces.
Invoice #10017 (07/26/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/26/2022 3:00 PM This fee includes the cost of two required inspections; one prior to construction and one after completion. |
$125.00 | x 1 | $125.00 |
Grand Total | |||
Total | $125.00 | ||
Payment 07/26/2022 | $125.00 | ||
Due | $0.00 |
Special Provisions
-The proposed field access shall be constructed approximately 30' West of the CR 51 and 150th St. S. intersection, North of CL.
-Culvert must be a minimum of 160' from nearest approach.
-Double arrow sign at intersection to remain in place. If damaged by farm equipment applicant is responsible for repair costs.
-Applicant is responsible for paying for culvert. Clay County requires a 18'' x 38' Corrugated Metal Pipe to be installed.
-Applicant shall install pipe at own expense.
-Applicant must maintain existing drainage by surveying ditch bottom elevations.
-The top width of the proposed driving surface will be a maximum of 26', with a 4:1 Slope down the sides.
-Access to be built matching road grade or slightly below grade to allow for maintenance operations.
-Applicant must contact the Clay County Highway Department to review the new entrance installation after project is complete.
-Applicant is responsible for contacting the watershed for any additional permits needed.
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jacob E. Stetz - 07/26/2022 3:01 PM 4f784ac9a67a897292e4ab69aba6ffcb 3ad007f6d01b4447c636b31826735fdd | |
#1 Engineering Technician | Shane M. Finck - 08/29/2022 9:35 AM c7dbad0bfd043120d4a43171aa481470 b73d480541ea434e99977cb3b175580b | |
#2 Assistant County Engineer | Justin P. Sorum - 08/29/2022 1:04 PM 9668b4edff054208c54f94222595c638 010791168665d8935b3237084b292842 | |
#3 County Engineer | Justin P. Sorum - 08/29/2022 1:05 PM b015f620875f56b75273cffc9ba9c953 aec053a8865ae2ffd61db384aa436e90 |