Access Access Permit# 24-09OL, UID# 13274
App. Status: Active
Clay County Highway Department
2951 41 1/2 Street South
Moorhead, MN 56560
Phone: 218.299.5099
Fax: 888.259.8757
highway.department@co.clay.mn.us
 

Duration

This entrance is: Permanent

Entrance

Entrance Type: Commercial
When is the entrance needed by:
06/24/2024

Location

Direction from road: E
County Road No.: 190th St N, County Rd 137
specific road, landmark, or intersection: Hwy 10 and 190th St N
Direction from specific road, landmark, or intersection: N
Miles: .09
Address or PID: 938 190th St N
City: Hawley
Type of building being constructed: Commercial
Present number of driveways:
0
Distance from nearest driveway (enter 0 if N/A): 300 feet 0 inches

Property

Description: Storage Building/Units

Applicant

Applicant:
Name:
Jeffrey Scott Mortenson
Phone:
(701238 - 9068
Email:
mortenson.masonry@loretel.net
Address:
938 190th St N
HAWLEY MN 56549

Property Owner

Property Owner:
Name:
Jeffrey Scott Mortenson
Phone:
(701238 - 9068
Address:
938 190th St N
Hawley MN 56549

Contractor

Contractor:
Name:
Jeffrey Mortenson
Phone:
(701238 - 9068
Address:
3634 190TH ST N
Hawley MN 56549

Sketch

Sketch:

Work Description

Work Description:
Storage Building/Units

Terms

General
  • I, We, the undersigned, herewith make application for permission to construct the Access Connection at the above location, said Access Connection will be constructed to conform with the regulations of the Department of Highway and to any special provisions included in the permit. It is agreed that all work will be done to the satisfaction fo the Department of Highway. It is further agreed that no work in connection with this application will be started until the application is approved and the permit issued. It is understood that this permit is conditioned upon replacement or restoration of the highway to its original or to a satisfactory condition. It is further understood that this permit is issued subject to the approval of local city authorities having joint supervision over said street or highway.

  • At minimum, applicants shall attach a sketch of the property which shall include identification of existing and proposed Access Connections in relation to any County Highways; and such sketches shall be drawn to scale when required by the Engineer. See Section 8.3.6 of the County Development Code for specific Access Permit submittal requirements.

  • The applicant should install a lath or stake at the location desired for the center of the proposed opening for accuracy during inspection prior to approval. The highway department will discuss the location with the applicant if it needs to be moved.

  • The Highway Department will inspect the location for safety, sight distance, proximity to other access openings and drainage requirements. The applicant will be notified of approval and/or any necessary requirements. All Access Connections will be reviewed for compliance with the County's Access Management Policy (see County Development Code Section 8.3.6).

  • If the Access Connection requires a drainage structure, the County will provide one culvert per quarter section in rural areas. In urban areas the County will provide one culvert per residence. The applicant will be responsible for installing the culvert the County has provided. The Highway Department will determine and order the appropriate size and length of culvert required.

  • If the Access Connection is for a residence or business receiving mail at the permitted location, Clay County will provide an approved mailbox support at the applicant's expense. Upon request, the mailbox support will be delivered at the same time as the culvert. The applicant will be required to install the support.

  • The cost of constructing the Access Connection is the responsibility of the applicant. This includes any fill or excavating that may be required. In urban areas, it is the responsibility of the applicant to remove and replace curb and gutter at the Access Connection location.

  • When construction of the Access Connection is completed in accordance with specifications and special provisions noted on the permit, the applicant shall notify the Highway Department for final inspection. The permitted Access Connection will not be considered complete until all disturbed areas have been fine graded, top soiled and seeded. All work is to be completed within 90 calendar days after receipt of the approved permit or as otherwise specified in the Access Permit. For additional information on permit duration standards, see Section 8.3.6 within the County Development Code.

  • Prior to beginning any excavation work, Minnesota Law requires the applicant or their contractor to contact Gopher State One-Call for locations of underground utilities. They can be reached at 800-252-1166.

  • Whenever work on the traveled portion of the roadway or shoulder is necessary, proper traffic control devices shall be furnished by the applicant and shall be in accordance with the most current edition of the Minnesota Manual on Uniform Traffic Control Devices, which is also available for review at the Clay County Highway Department at the applicant's request.

  • Please note that all equipment which may damage surfaced roadways is prohibited from use on the roadway. Any damage to the roadway surface due to loading, unloading or operating such equipment will be assessed to the applicant. Please help us protect our highway surfaces.

Invoice #12522 (06/21/2024)

Charge Cost Quantity Total
Non-Taxable
added 06/21/2024 8:33 AM

This fee includes the cost of two required inspections; one prior to construction and one after completion.

$125.00 x 1 $125.00
Grand Total
Total $125.00
Payment 06/21/2024$125.00
Due$0.00
Action: Print  

Special Provisions

-The proposed access shall be constructed approximately 450' North of the CR 113 and HWY 10 intersection. Access must be a minimum of 450' North of HWY 10 CL. East of CR 113 CL.
-Clay County will furnish and deliver 18'' x 48' Corrugated Metal Pipe.
-Applicant shall install pipe at their own expense.
-Applicant must maintain existing drainage by surveying ditch bottom elevations.
-The top width of the proposed driving surface will be a maximum of 28', with a 4:1 Slope down the sides.
-Access to be built matching road grade or slightly below grade to allow for maintenance operations.
-Applicant must contact the Clay County Highway Department to review the new entrance installation after project is complete.
-Applicant is responsible for contacting the Watershed and any other entities for any additional permits needed.

Approvals

ApprovalSignatureOptions
ApplicantJeffrey S. Mortenson - 06/21/2024 8:39 AM
e735ea62dcc86dbaa113e2365bcf9771
9a34b95bb48908bec46197e2d9bc04c6
 
#1 Engineering TechnicianShane M. Finck - 07/10/2024 8:02 AM
200cdba73a7e4e0152eddfedc5aa9e94
1f2779fc1b00270058e7d42559a8fafd
 
#2 Assistant County EngineerAlex Soyring - 07/10/2024 1:26 PM
3f4721a449b7de42a51dd43cd340591a
190d9f69a2bc117834bc739a21fd6a03
 
#3 County EngineerJustin P. Sorum - 07/12/2024 10:12 AM
a2523984200204d6e750f0c98817cecf
dc3cd7324b752075b1f7fb31c34def89
 
Permit has been approved. All signatures have been obtained.
Powered by