Access Access Permit# 26-06OL, UID# 25204
App. Status: Pending review
Clay County Highway Department
2951 41 1/2 Street South
Moorhead, MN 56560
Phone: 218.299.5099
Fax: 888.259.8757
highway.department@co.clay.mn.us
 

Duration

This entrance is: Permanent

Entrance

Entrance Type: Field Access
When is the entrance needed by:
07/15/2026

Location

Direction from road: S
County Road No.: 2
specific road, landmark, or intersection: Buffalo River Bridge
Direction from specific road, landmark, or intersection: E
Miles: 0.218
Mapped Location:
City: Barnesville
Present number of driveways:
3 field access approaches
Distance from nearest driveway (enter 0 if N/A): 1314 feet 0 inches

Applicant

Applicant:
Name:
Timothy S Thompson
Phone:
(701238 - 0199
Email:
ejectorbucket@gmail.com
Address:
12047 110th St. S.
Barnesville MN 56514

Property Owner

Property Owner:
Name:
Margaret Ann Thompson
Phone:
(701238 - 0199
Address:
12047 110th St. S.
Barnesville MN 56514

Contractor

Contractor:
Name:
Timothy S Thompson
Phone:
(701238 - 0199
Address:
12047 110th St. S.
Barnesville MN 56514

Sketch

Work Description

Work Description:
Relocate existing approach to the East approximately 230 feet. Reason: Current approach is next to ditch that crosses highway. Frequent flooding has made current approach difficult to use. Moving approach to the East would put greater distance between approach and bridge. Higher field elevation will reduce grade incline between highway and field. Less saturated ground, less slope, and greater distance from the bridge should increase roadway safety and reduce the chance of getting soil on the road surface. i am not seeking any ditch grade modifications or culvert diameter changes to change water flow rates in the ditch. With larger equipment and trucks, I would welcome any width modifications that are recommended.

Terms

General
  • I, We, the undersigned, herewith make application for permission to construct the Access Connection at the above location, said Access Connection will be constructed to conform with the regulations of the Department of Highway and to any special provisions included in the permit. It is agreed that all work will be done to the satisfaction fo the Department of Highway. It is further agreed that no work in connection with this application will be started until the application is approved and the permit issued. It is understood that this permit is conditioned upon replacement or restoration of the highway to its original or to a satisfactory condition. It is further understood that this permit is issued subject to the approval of local city authorities having joint supervision over said street or highway.

  • At minimum, applicants shall attach a sketch of the property which shall include identification of existing and proposed Access Connections in relation to any County Highways; and such sketches shall be drawn to scale when required by the Engineer. See Section 8.3.6 of the County Development Code for specific Access Permit submittal requirements.

  • The applicant should install a lath or stake at the location desired for the center of the proposed opening for accuracy during inspection prior to approval. The highway department will discuss the location with the applicant if it needs to be moved.

  • The Highway Department will inspect the location for safety, sight distance, proximity to other access openings and drainage requirements. The applicant will be notified of approval and/or any necessary requirements. All Access Connections will be reviewed for compliance with the County's Access Management Policy (see County Development Code Section 8.3.6).

  • If the Access Connection requires a drainage structure, the County will provide one culvert per quarter section in rural areas. In urban areas the County will provide one culvert per residence. The applicant will be responsible for installing the culvert the County has provided. The Highway Department will determine and order the appropriate size and length of culvert required.

  • If the Access Connection is for a residence or business receiving mail at the permitted location, Clay County will provide an approved mailbox support at the applicant's expense. Upon request, the mailbox support will be delivered at the same time as the culvert. The applicant will be required to install the support.

  • The cost of constructing the Access Connection is the responsibility of the applicant. This includes any fill or excavating that may be required. In urban areas, it is the responsibility of the applicant to remove and replace curb and gutter at the Access Connection location.

  • When construction of the Access Connection is completed in accordance with specifications and special provisions noted on the permit, the applicant shall notify the Highway Department for final inspection. The permitted Access Connection will not be considered complete until all disturbed areas have been fine graded, top soiled and seeded. All work is to be completed within 90 calendar days after receipt of the approved permit or as otherwise specified in the Access Permit. For additional information on permit duration standards, see Section 8.3.6 within the County Development Code.

  • Prior to beginning any excavation work, Minnesota Law requires the applicant or their contractor to contact Gopher State One-Call for locations of underground utilities. They can be reached at 800-252-1166.

  • Whenever work on the traveled portion of the roadway or shoulder is necessary, proper traffic control devices shall be furnished by the applicant and shall be in accordance with the most current edition of the Minnesota Manual on Uniform Traffic Control Devices, which is also available for review at the Clay County Highway Department at the applicant's request.

  • Please note that all equipment which may damage surfaced roadways is prohibited from use on the roadway. Any damage to the roadway surface due to loading, unloading or operating such equipment will be assessed to the applicant. Please help us protect our highway surfaces.

Invoice #24241 (06/05/2026)

Charge Cost Quantity Total
Non-Taxable
added 06/05/2026 3:47 PM

This fee includes the cost of two required inspections; one prior to construction and one after completion.

$125.00 x 1 $125.00
Grand Total
Total $125.00
Payment 06/05/2026$125.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantTimothy S. Thompson - 06/05/2026 4:09 PM
ba2ea44f86b1edde0132aff630ffdc8e
1d903fe49485f80f6034dcbc94545075
 
#1 Engineering TechnicianZach Wulfekuhle - 06/19/2026 11:48 AM
a368b75e65a473b847b418a50c5e687e
85be53acf746b4e2d9318390765f0e60
 
#2 Assistant County EngineerAlex Soyring - 06/19/2026 1:35 PM
9a8afbe26f2edf64e55baf1a750ab5bb
2e0824d79ab06ea5169ed529c461f9b1
 
#3 County Engineer 
You do not have the necessary rights for this signature
Permit will be approved after the above signatures are obtained.
Powered by