Access Access Permit# 24-18OL, UID# 13985
App. Status: Active
Clay County Highway Department
2951 41 1/2 Street South
Moorhead, MN 56560
Phone: 218.299.5099
Fax: 888.259.8757
highway.department@co.clay.mn.us
 

Duration

This entrance is: Permanent

Entrance

Entrance Type: Commercial
When is the entrance needed by:
11/15/2024

Location

Direction from road: N
County Road No.: 69
specific road, landmark, or intersection: County 11
Direction from specific road, landmark, or intersection: E
Miles: 0.21
Mapped Location:
Address or PID: 06.005.3600
Type of building being constructed: Commercial
Present number of driveways:
1 field approach, will be replaced by this commercial driveway.
Distance from nearest driveway (enter 0 if N/A): 750 feet 0 inches

Property

Description: Self-Storage Units

Applicant

Applicant:
Name:
Tyler Trenda
Phone:
(701235 - 0199
Email:
ttrenda@lowryeng.com
Address:
5306 51st Ave S
Suite A.
Fargo ND 58104

Property Owner

Property Owner:
Name:
Jay Stenerson
Address:
13504 E Big Comorant Rd
Audubon MN 56511

Contractor

Contractor:
Name:
RBF Contracting - Attn: Alayna Stenerson
Phone:
(218236 - 9310
Address:
1911 26th St S
Moorhead MN 56560

Sketch

Work Description

Work Description:
New self storage buildings with gravel drive lanes and driveway. New water quality ponds will be constructed and a new culvert will be installed under the driveway.

Terms

General
  • I, We, the undersigned, herewith make application for permission to construct the Access Connection at the above location, said Access Connection will be constructed to conform with the regulations of the Department of Highway and to any special provisions included in the permit. It is agreed that all work will be done to the satisfaction fo the Department of Highway. It is further agreed that no work in connection with this application will be started until the application is approved and the permit issued. It is understood that this permit is conditioned upon replacement or restoration of the highway to its original or to a satisfactory condition. It is further understood that this permit is issued subject to the approval of local city authorities having joint supervision over said street or highway.

  • At minimum, applicants shall attach a sketch of the property which shall include identification of existing and proposed Access Connections in relation to any County Highways; and such sketches shall be drawn to scale when required by the Engineer. See Section 8.3.6 of the County Development Code for specific Access Permit submittal requirements.

  • The applicant should install a lath or stake at the location desired for the center of the proposed opening for accuracy during inspection prior to approval. The highway department will discuss the location with the applicant if it needs to be moved.

  • The Highway Department will inspect the location for safety, sight distance, proximity to other access openings and drainage requirements. The applicant will be notified of approval and/or any necessary requirements. All Access Connections will be reviewed for compliance with the County's Access Management Policy (see County Development Code Section 8.3.6).

  • If the Access Connection requires a drainage structure, the County will provide one culvert per quarter section in rural areas. In urban areas the County will provide one culvert per residence. The applicant will be responsible for installing the culvert the County has provided. The Highway Department will determine and order the appropriate size and length of culvert required.

  • If the Access Connection is for a residence or business receiving mail at the permitted location, Clay County will provide an approved mailbox support at the applicant's expense. Upon request, the mailbox support will be delivered at the same time as the culvert. The applicant will be required to install the support.

  • The cost of constructing the Access Connection is the responsibility of the applicant. This includes any fill or excavating that may be required. In urban areas, it is the responsibility of the applicant to remove and replace curb and gutter at the Access Connection location.

  • When construction of the Access Connection is completed in accordance with specifications and special provisions noted on the permit, the applicant shall notify the Highway Department for final inspection. The permitted Access Connection will not be considered complete until all disturbed areas have been fine graded, top soiled and seeded. All work is to be completed within 90 calendar days after receipt of the approved permit or as otherwise specified in the Access Permit. For additional information on permit duration standards, see Section 8.3.6 within the County Development Code.

  • Prior to beginning any excavation work, Minnesota Law requires the applicant or their contractor to contact Gopher State One-Call for locations of underground utilities. They can be reached at 800-252-1166.

  • Whenever work on the traveled portion of the roadway or shoulder is necessary, proper traffic control devices shall be furnished by the applicant and shall be in accordance with the most current edition of the Minnesota Manual on Uniform Traffic Control Devices, which is also available for review at the Clay County Highway Department at the applicant's request.

  • Please note that all equipment which may damage surfaced roadways is prohibited from use on the roadway. Any damage to the roadway surface due to loading, unloading or operating such equipment will be assessed to the applicant. Please help us protect our highway surfaces.

Invoice #13167 (10/22/2024)

Charge Cost Quantity Total
Non-Taxable
added 10/22/2024 4:36 PM

This fee includes the cost of two required inspections; one prior to construction and one after completion.

$125.00 x 1 $125.00
Grand Total
Total $125.00
Payment 10/22/2024$125.00
Due$0.00
Action: Print  

Special Provisions

-The proposed access shall be constructed approximately 1116' East of the CSAH 11 and CR 69 intersection, North of CL.
-Applicant to pay for pipe.
-Clay County Clay County requires Corrugated Metal Pipe to be installed in access.
-Applicant must maintain existing drainage by surveying ditch bottom elevations.
-The top width of the proposed driving surface will be a maximum of 28', with a 4:1 Slope down the sides.
-Access to be built matching road grade or slightly below grade to allow for maintenance operations.
-Applicant must contact the Clay County Highway Department to review the new entrance installation after project is complete.
-Applicant is responsible for contacting the Watershed District for any additional permits needed.

Approvals

ApprovalSignatureOptions
ApplicantTyler Trenda - 10/22/2024 4:36 PM
841c962f6954d2cc95fd9ec8e9d0543f
264bc3f5bd6d2a64ad72267d056ce6ed
 
#1 Engineering TechnicianShane M. Finck - 11/06/2024 11:22 AM
30e797cdb1d684441d8df2d2c1063bfc
0933ac05874981c115ccb9fc06ea2965
 
#2 Assistant County EngineerAlex Soyring - 11/06/2024 11:59 AM
fa06812d67d85d0b560be09a18a3ef5c
4fa1d3d0235803d5d2ddcaa321facb46
 
#3 County EngineerJustin P. Sorum - 11/25/2024 9:23 AM
adb239430fbb9d39a9f2efe34ee87c15
ceb27d53711b9f4b7ebd7b50c14fcf10
 
Permit has been approved. All signatures have been obtained.